Get in touch anytime,
our engineers will answer your selection and process questions

Tell us about your project

From water testing and process design to manufacturing, installation and commissioning, the whole project stays with the Guanke team — clear responsibility, controllable delivery.

Hotline: 13081695372 (also on WeChat)

Email: info@guankeeco.com

Plant address: Weifang, Shandong (please call ahead; visits to commissioned sites can be arranged)

Looking forward to working with you

Matching the process to the site and guaranteeing compliance with the equipment — that is the principle behind every project we deliver.

Plant Address

Guanke fields an experienced process engineering and commissioning team,

Weifang, Shandong, China

Hotline

Guanke fields an experienced process engineering and commissioning team,

13081695372

Email

Guanke fields an experienced process engineering and commissioning team,

info@guankeeco.com

What You May Want to Know

Still have questions? Call us at 13081695372.

Our main products are integrated wastewater treatment units, MBR membrane bioreactors, dissolved air flotation units, screw press sludge dewatering machines, rotary bar screens and complete industrial wastewater treatment systems. We also provide process design, installation, commissioning and O&M.

It depends on flow rate, water quality, discharge standard and site conditions. Domestic sewage usually uses an integrated unit with MBR, food and slaughterhouse wastewater normally needs DAF pre-treatment, and industrial wastewater gets a process train tailored to the sector. Send us your water data for free selection advice.

Price depends on capacity, effluent standard, material (carbon steel or stainless steel) and configuration. Small integrated units start in the tens of thousands of RMB; complete industrial projects range into the hundreds of thousands. Share your flow rate, water quality and site and we will quote item by item — never a vague lump sum.

Standard integrated units take 7–15 days to build and 3–7 days to install and commission on site. Complete industrial projects take roughly 30–60 days depending on process complexity. The schedule is written into the contract.

Depending on the process, effluent reliably meets Grade 1A/1B of China’s discharge standard for municipal wastewater plants, or local and industry-specific standards. Where reuse is required, MBR with advanced treatment delivers water for irrigation, flushing or production reuse.

The units are highly automated — routine inspection and periodic cleaning are enough. We provide operator training, spare parts and remote or on-site maintenance, and keep common wear parts in stock all year.

Most welcome. Several commissioned projects in and around Weifang can be visited on site, and we can also show you live operating data online. Please call ahead to book a factory visit.

The complete unit carries a one-year warranty, with a longer term on the main structure; non-human damage is repaired free of charge. Response time is 24–48 hours inside Shandong and within 48 hours elsewhere, by engineer visit or remote support.

Follow Guanke WeChat / Douyin / Channels

Matching the process to the site and guaranteeing compliance with the equipment — that is the principle behind every project we deliver.