The question we hear most often is “which unit do I need for X cubic metres a day?” Flow rate alone cannot answer it. Selection follows five inputs; when four of them are missing, the honest answer is a range of options, not a single model.
1. Flow rate — including the peak
Design on the hourly peak, not the daily average. A hotel or a food plant may discharge most of its water in a four-hour window; a unit sized on the daily figure will be overloaded exactly when the load arrives. Ask for the peak factor, or measure it.
2. Water quality — ranges, not averages
COD, BOD, suspended solids, ammonia nitrogen, oils and grease, pH, salinity and any heavy metals or toxic compounds. For industrial streams, sample across production cycles. One grab sample from a good day has designed many plants that later failed.
3. Discharge standard or reuse target
Grade 1A, Grade 1B, an industry standard, a municipal pretreatment permit or a reuse specification for irrigation and flushing — each shifts the process train. Reuse targets usually add membrane or advanced treatment and change the whole cost structure.
4. Site conditions
Available footprint, indoor or outdoor, inlet elevation, power capacity, climate and access for desludging. A buried unit saves land but complicates maintenance; a containerised unit is fast to install but needs room for the truck that lifts it.
5. Operation reality
Who will run the plant, how often they visit, and whether they can handle chemicals and membranes. The best process for a site with no operator is the simplest one that meets the limit — automation and remote monitoring beat sophistication in that situation.
Putting it together
Domestic sewage at moderate flow with a Grade 1B limit: an integrated unit with A/O or MBBR plus disinfection. Food or slaughterhouse wastewater: DAF first, then biological treatment. Textile dyeing: equalisation, chemical dosing, DAF, anaerobic or anoxic stages, aerobic treatment and polishing. Hospital wastewater: biological treatment plus disinfection, with strict control of the sludge route.
Send us those five inputs and we will return a process route, an equipment list and an itemised quotation — with the assumptions written down.